Draft Work Plan (2016-17) of the Global Environment Monitoring System, Water, Programme, UNEP GEMS/Water
Date
2016-05Author
United Nations Environment Programme
Citation Tool
Bibliographic Managers
RT Generic T1 Draft Work Plan (2016-17) of the Global Environment Monitoring System, Water, Programme, UNEP GEMS/Water A1 United Nations Environment Programme YR 2016-05 LK https://wedocs.unep.org/20.500.11822/11224 PB AB TY - GEN T1 - Draft Work Plan (2016-17) of the Global Environment Monitoring System, Water, Programme, UNEP GEMS/Water AU - United Nations Environment Programme Y1 - 2016-05 UR - https://wedocs.unep.org/20.500.11822/11224 PB - AB - @misc{20.500.11822_11224 author = {United Nations Environment Programme}, title = {Draft Work Plan (2016-17) of the Global Environment Monitoring System, Water, Programme, UNEP GEMS/Water}, year = {2016-05}, abstract = {}, url = {https://wedocs.unep.org/20.500.11822/11224} } @misc{20.500.11822_11224 author = {United Nations Environment Programme}, title = {Draft Work Plan (2016-17) of the Global Environment Monitoring System, Water, Programme, UNEP GEMS/Water}, year = {2016-05}, abstract = {}, url = {https://wedocs.unep.org/20.500.11822/11224} } TY - GEN T1 - Draft Work Plan (2016-17) of the Global Environment Monitoring System, Water, Programme, UNEP GEMS/Water AU - United Nations Environment Programme UR - https://wedocs.unep.org/20.500.11822/11224 PB - AB -View/Open
Item Statistics
Display item statisticsMetadata
Show full item recordDescription
Following UNEA Resolution 1/9 a revised GEMS/Water Programme has been developed for adoption by the United Nations Environment Assembly at its second session (UNEP/EA.2/8) to which this draft work plan refers. It highlights the work plans and work flows including milestones for each of the components organized in work packages, related tasks and timelines.
Collections
Document Viewer
To read more, scroll down below.