Gaza Strip: Preliminary Debris Quantification - Damage Assessment Analysis: 4th April 2025

Date
2025-05Author
United Nations Environment Programme
Citation Tool
Bibliographic Managers
RT Generic T1 Gaza Strip: Preliminary Debris Quantification - Damage Assessment Analysis: 4th April 2025 A1 United Nations Environment Programme YR 2025-05 LK https://wedocs.unep.org/20.500.11822/47573 PB AB TY - GEN T1 - Gaza Strip: Preliminary Debris Quantification - Damage Assessment Analysis: 4th April 2025 AU - United Nations Environment Programme Y1 - 2025-05 UR - https://wedocs.unep.org/20.500.11822/47573 PB - AB - @misc{20.500.11822_47573 author = {United Nations Environment Programme}, title = {Gaza Strip: Preliminary Debris Quantification - Damage Assessment Analysis: 4th April 2025}, year = {2025-05}, abstract = {}, url = {https://wedocs.unep.org/20.500.11822/47573} } @misc{20.500.11822_47573 author = {United Nations Environment Programme}, title = {Gaza Strip: Preliminary Debris Quantification - Damage Assessment Analysis: 4th April 2025}, year = {2025-05}, abstract = {}, url = {https://wedocs.unep.org/20.500.11822/47573} } TY - GEN T1 - Gaza Strip: Preliminary Debris Quantification - Damage Assessment Analysis: 4th April 2025 AU - United Nations Environment Programme UR - https://wedocs.unep.org/20.500.11822/47573 PB - AB -View/Open
Item Statistics
Display item statisticsMetadata
Show full item recordDescription
This initial quantification of conflict generated debris in the Gaza Strip is derived from a UNOSAT Comprehensive Damage Assessment using imagery from 4 April 2025, in conjunction with updated building footprint as of May 2023 based on the national statistical office data. Damaged building footprints were enriched through zonal statistics with an above surface height model, derived from the difference between a Digital Terrain Model (SRTM) and a Digital Surface Model (ALOS World 3D) as provided by
the European Commission in the GHS-Built H product.
Collections
Document Viewer
To read more, scroll down below.